CE31102: Water Power Engineering

From Metakgp Wiki
Jump to navigation Jump to search
CE31102
Course name Water Power Engineering
Offered by Civil Engineering
Credits 3
L-T-P 3-0-0
Previous Year Grade Distribution
{{{grades}}}
Semester Spring


Syllabus[edit | edit source]

Syllabus mentioned in ERP[edit | edit source]

Power generation through storage (dams) and diversion (barrages); run-of the river schemes with and without pondage; integrated powerhouse with barrage / on diversion channel; pumped storage schemes; tidal power plants; hydroelectric plant layouts for open flow diversion schemes and pressure diversion system or their combinations; underground projects with pressure diversion systems; position of power house (surface, underground or semi- underground); hydropower conveyance structures â intakes, conveyance structures and outflow structures; intakes to canals and tunnels (with corresponding de-silting arrangements); intakes for in-stream powerhouses; reservoir type intakes â trash rack and its deign; intakes for embankment dams; water conducting systems â open channels, fore-bays, tunnels, surge tanks, penstocks, valves and anchor blocks; layout and sections of tunnels; tunnel deign basics; construction methods for tunnels; penstock components (bends, reducer, branches, manifolds); turbine foundations and overhead traveling crane frame; underground powerhouse cavern; types of turbines and their selection.


Concepts taught in class[edit | edit source]

Student Opinion[edit | edit source]

How to Crack the Paper[edit | edit source]

Classroom resources[edit | edit source]

Additional Resources[edit | edit source]